[6 Apr 2011]

Empennage :: Elevators
Dimpled and riveted left elevator
2.5 Hours

Today was a good day on the project and one of those days where I actually ended up with something at the end of it. I started the session by dimpling the skin and then clecoed the freshly dimpled skin to the understructure, shown here.

Jump ahead an hour or so and the left elevator is all buttoned up!

And a final parting shot of the trim tab servo/inspection cover installed on the bottom of the elevator.